Burj Al Fattan Tower

 Client:                    All Fattan Properties

 Architect:             LWD Architects

 Consultant:          Hyder Consulting Middle East Ltd

 Location:              Dubai, UAE

 DNEC role:           Engaged with Hyder Consulting Middle East Ltd to

                                prepare Concept and Preliminary design.

 Duration:              June 2008 - Dec, 2008, DNEC - Belgrade, Serbia

 Status:                 Tender stage


Composite Steel/Reinforced concrete tower structure. Mixed use high-rise development   of 97 storeys. Total height 463m. Four underground parking levels. High strength   concrete up to 100MPa cylinder strength utilized.

      Picture:

      Revit model of the structure

                                                

 

 |  Site map |  Search |  Disclaimer |