Burj Al Fattan Tower
Client: All Fattan Properties 
Architect: LWD Architects
Consultant: Hyder Consulting Middle East Ltd
Location: Dubai, UAE
DNEC role: Engaged with Hyder Consulting Middle East Ltd to
prepare Concept and Preliminary design.
Duration: June 2008 - Dec, 2008, DNEC - Belgrade, Serbia
Status: Tender stage
Composite Steel/Reinforced concrete tower structure. Mixed use high-rise development of 97 storeys. Total height 463m. Four underground parking levels. High strength concrete up to 100MPa cylinder strength utilized.
Picture:
Revit model of the structure
.jpg)



