Burj Al Fattan Tower
  • Project Name: Burj Al Fattan Tower
  • Client: All Fattan Properties
  • Architect: LWD Architects
  • Consultant: Hyder Consulting Middle East Ltd
  • Location: Dubai, UAE
  • DNEC role: Engaged with Hyder Consulting Middle East Ltd to prepare Concept and Preliminary design.
  • Duration: June 2008 – Dec, 2008, DNEC – Belgrade, Serbia
  • Status: Tender stage

Composite Steel/Reinforced concrete tower structure. Mixed use high-rise development of 97 storeys. Total height 463m. Four underground parking levels. High strength concrete up to 100MPa cylinder strength utilized.

 

Picture: Revit model of the structure

Copyright © DNEC 2012. All rights reserved
Powered by Pixel
  Rss feed       E-mail